Surveyor III Mission Report: Mission description and performance

Surveyor III Mission Report: Mission description and performance

4.11 - 1251 ratings - Source



was found during PVT 1 and was attributed to an improperly grounded soldering iron. ... During this period, when Oxidizer Tank 2 was removed for rework of the temperature transducer standoff, the ... of problems and unit replacements was reviewed and the decision was made to return the spacecraft to El Segundo foranbsp;...


Title:Surveyor III Mission Report: Mission description and performance
Author: Jet Propulsion Laboratory (U.S.), United States. National Aeronautics and Space Administration
Publisher: - 1967
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA